Company updates, product and service announcements, short notes and any open roles — dated, and kept in the open. The ten most recent posts sit here; everything older files under its year and month.
Newest first, ten at a time. Anything that falls out of this list keeps the same address and stays reachable from its month.
JEE-SVC-008 — four pages, written for the engineer standing at the machine rather than for a purchase file. What is on each page, and what we would ask you to do with it. Read →
The three faults behind almost every commissioning call-out — plus the ten-point pre-start check and the numbers that decide whether to stop the fan. Read →
27 insight notes, 45 case references, 15 troubleshooting guides and 1,018 photographs of real dispatched fans — across 37 industries, 45 applications and 8 fan families. Read →
One-line changes worth recording — a revision, a new download, a corrected figure.
We hire in step with our order book, so we do not always keep a standing list. Live openings are posted on our LinkedIn page, and we are always glad to hear from skilled people in engineering, fabrication, quality and service. Send us your details →
Every post keeps its address for good. These pages are views onto them, not new homes.
Flow, static, gas temperature, application — or attach a spec, GA drawing or a multi-fan schedule. Engineer to engineer.
ISO 9001:2015 quality system · performance-tested to IS 4894 / ISO 5801 / AMCA 210 method · witnessed FAT on request.
*For our standard range. ATEX and special projects need 7 to 10 working days.
This site sets no cookies of its own. Google Analytics loads only if you accept. It sets two cookies, so we can see which fan topics people actually read. Decline and no analytics loads — the site works exactly the same. What we collect →