1 · Before you touch the fan
Signal words as the fan’s labels use them, the rules that never bend, and what to record off the nameplate and the GA drawing before you begin.
The Jitamitra Fan Manual JEE-MAN-002 v3.0 is the site edition, written for the engineer and fitter at the fan — seven chapters, from the delivery check to every limit on one page. 20-page PDF, direct download, no form.
Each chapter is written for the person doing that step, with the checks in sequence and the numbers beside them.
Signal words as the fan’s labels use them, the rules that never bend, and what to record off the nameplate and the GA drawing before you begin.
What to check before you sign for the delivery, what the factory protection is and when it comes off, how to lift, how to store, and re-commissioning after more than 45 days in store.
The pre-installation checklist, foundation, levelling and grouting, shipping restraints, assembly, belt drives, couplings, accessories, and the duct and electrical connections.
Pre-commissioning checks, the rotation check at first start, the 5-minute and 8-hour runs, belts after first start, electrical checks, the vibration baseline, star-delta and VFD starting, and sign-off.
Starting, what to watch and how often, bearing temperature and what sets it, motor current, stopping, operating limits, special conditions, changing the duty safely, and restart after a long shutdown.
The schedule, the grease to use, the re-lubrication interval and quantity, the impeller, belts, couplings and accessories, the motor, casing and fasteners, and the maintenance log.
The numbers from every chapter, gathered on a single page.
The installation & commissioning card is the field summary: every check in sequence, kept with the fan. Download the card.
The manual carries the reasons, the tables and the maintenance schedule behind each check. Where the card and the manual differ, the manual governs.
Free download — no formJitamitra Fan Manual JEE-MAN-002 v3.0Fan installation, operation and maintenance — site edition, Rev 3, issued 15 October 2026. Written for the engineer and fitter at the fan.Download the manual Chapter 7 puts every limit on one page, and the manual’s last page lists when to call Jitamitra. The Jitamitra Help Desk is on +91 8329172325, phone and WhatsApp, and the 15 field guides cover the problems we see most on site.
Flow, static, gas temperature, application — or attach a spec, GA drawing or a multi-fan schedule. Engineer to engineer.
ISO 9001:2015 quality system · performance-tested to IS 4894 / ISO 5801 / AMCA 210 method · witnessed FAT on request.
*For our standard range. ATEX and special projects need 5 to 7 working days.
This site sets no cookies of its own. Google Analytics loads only if you accept. It sets two cookies, so we can see which fan topics people actually read. Decline and no analytics loads — the site works exactly the same. What we collect →